Bradfield C.E. Primary School

From Parish Wiki
Jump to: navigation, search

BRADFIELD PRIMARY SCHOOL

Year Six Contributions (Page 1) HALLOWEEN
Bradfield Church of England Primary School - Year Six (2009) Contributions (Page 2) NATURE
Bradfield Church of England Primary School - Year Six (2009) Contributions (Page 3) FANTASY
Bradfield Church of England Primary School - Year Six (2009) Contributions (Page 4) MISCELLANEOUS
Bradfield Church of England Primary School - Year Six (2009) Contributions (Page 5) PANGRAMS



Latest News from the Primary Project - April, 2010

The builders have arrived at Bradfield Primary School!

Francis Contractors started at the end of last month and - if all goes according to plan - the new school hall could be ready by Christmas.

Buildings include the hall, kitchen, library, quiet room, lavatories and a storage area for PE equipment.

In the old part of the school the boiler will be replaced to give new heating and hot water systems. A fire and intruder alarm will be installed along with fire doors.

The total cost is £863,000, of which £185,000 came from the Primary Project. Once again, a huge thank you to everyone who has supported the campaign.

The contractors expect the building to take forty weeks and are accessing the site at the back of the school via the bridleway.

More building news next month.


But you can still support The Primary Project by cheque made payable to 'The Primary Project' and send it to Bradfield C of E Primary School, Cock Lane, Bradfield Southendk Reading, RG7 6HR, or go to http://www.justgiving.com/primaryproject

Return to Welcome to Bradfield Parish, the start of the Bradfield Parish Wiki

Back to Bradfield Parish Home Page

Personal tools